A historic site is being carefully revitalized and transformed into a unique place to stay through a contemporary hotel concept.

The design concept blends the monastery’s unique atmosphere with the demands of a modern, high-end hotel. Existing structures and distinctive elements form the foundation for a design that allows history to be felt while simultaneously creating new spatial qualities. The Limehome Hotel blends seamlessly into its historic setting and, from there, develops a distinct, contemporary identity—serene, refined, and with a keen eye for materials and detail.

Time period
September 2023 – May 2024
Location
Krems
Status
completed
Scope of Work
Planning, ÖBA
loading="lazy"
loading="lazy"
loading="lazy"
loading="lazy"
loading="lazy"
  • loading="lazy"
  • loading="lazy"
  • loading="lazy"
  • loading="lazy"
  • loading="lazy"

A total of 21 hotel apartments were built on two levels in the former monastery wing of the 17th-century, historically protected monastery complex. The design was guided by the BDA’s requirement that no changes be made to the exterior envelope and that penetrations for building services piping be kept to a minimum; the existing floor coverings were to be preserved. The size of the rooms was therefore determined by the permissible light-entry area of the historic window openings. Access is via the existing main entrance and the foyer. The existing stairwell leads to the 12 room units on Level E1, while the existing staircase on the north side serves as a second emergency exit. The 9 units on the ground floor are accessed directly via a covered entrance in the inner courtyard; one of these units was designed to be wheelchair-accessible. To meet fire safety and sound insulation requirements, all new partition walls were installed on the exposed concrete ceiling; the existing flooring was removed only in these areas. In the rooms on Level E0, the historic exposed wooden ceiling was preserved as is; a new suspended drywall ceiling was installed only in the entryway and the bathroom. For the 21 units, three bathroom types, a color and material concept, and the design of the built-in fixtures were developed and implemented.